Infrastructure projects run on drawings. So does Inspector.
Upload the design files → get the quantities → run the field → check every payment application against the design.

Software your team runs, or engineering control our engineers deliver. Used on light rail, road, water and sewer projects across Israel.

The Inspector map with the bill of quantities beside it

How Inspector works

🔑
01

Sign up

You join through a personal email invitation. Click the link, fill in a few details and you are in. No long forms and no waiting.

📂
02

Upload AutoCAD

Upload AutoCAD files straight into the system. Inspector converts them into a live map in the cloud. Nothing to install, it all happens online.

🗺
03

Work on the map

Your drawings become an interactive map with clean layers. Turn layers on and off, change colours, and measure distances and areas.

📌
04

Record and manage

Create tasks straight from the map, pin them to an exact location, attach photos or voice notes from the field, and follow the work as it progresses. The whole team sees the same picture in real time.

📊
05

Stay in control

The management area shows every task and every file, filtered by status, date or subject. Reports come out ready to submit.

Quantity takeoff in Inspector

From sign-up to reports, everything in one system.

Every infrastructure layer in one system, on every project

Site development layer
Sewer layer
Drainage layer
Water layer
Roads layer
Communications layer
Lighting layer

What our customers say

Precision and control on large infrastructure projects
Electra Infrastructures logo

“Inspector added real value in managing and controlling the Route 6 and Beit Nehemia interchange project, with accuracy in both design and execution.”

Electra Infrastructures

Location-based task management and real-time budget control
M. Barashi Infrastructures logo

“The system let us manage location-based tasks and control the budget in real time on the HaMasger Street project in Tel Aviv. Highly recommended.”

M. Barashi Infrastructures

A clear improvement in task management and budget control
Donna logo

“The system contributed a great deal to task management, budget control and account preparation on our project in Modi’in Illit. We recommend it.”

Donna Ze Bait

Defects picked up and reported in real time
Mei Shemesh Water Utility logo

“The Collector module let us catch discrepancies in real time on the Beit Shemesh project, and produced detailed reports on execution defects.”

Mei Shemesh Water Utility

Accurate budget management on complex infrastructure projects
Shapir logo

“Inspector gave us tools for managing and controlling the budget on the Jerusalem Light Rail project, with a deep understanding of the project’s scope and its constraints.”

Shapir

Better control and budgeting on national road projects
Minrav logo

“The system helped us understand the constraints better and improve budget control on the Route 444 project for Netivei Israel.”

Minrav

Better design and task management on infrastructure projects
Inspector, infrastructure project control

“Inspector helped us improve detailed design and task management on the Tzur Hadassah project, and brought consistency to the work between the design teams.”

CPM

More accurate cost estimates in infrastructure
Paz Economics and Engineering logo

“Inspector improved the accuracy of our cost estimates in residential neighbourhoods across the country. Recommended for anyone commissioning infrastructure work.”

Paz Economics and Engineering

Engineering services alongside the platform

Alongside the technology, Inspector's engineers deliver quantity takeoff and quantity control against the design at every stage of a project: split by phase and work area, with design alternatives priced, and with ongoing support shaped around what the client needs.

Quantity takeoff and control

The client gets an accurate bill of quantities based on the design, on a display that shows where every quantity was measured and where it sits in the BoQ. That means a real understanding of the design and the quantities, and far fewer disputes over the life of the project.

ההבדלים בין מחירון נתיבי ישראל למחירון משרד השיכון
איפה פאושלי נכנס למכרז מסגרת

Ongoing support

Full control and design management for the life of the project, from design through to handover.

Handover to the client

Support through the handover process.

המפרט הכללי - הספר הכחול בכתב כמויות

Frequently asked questions

What is Inspector?

A cloud platform for infrastructure projects, from design through to execution in the field. Upload CAD files, manage layers, create tasks, document what happens on site and produce accurate reports.

Contractors, execution engineers, project managers, local authorities and infrastructure companies. Anyone who has to run a complex project efficiently and transparently.

Yes. It runs on any device, desktop, tablet or phone, with full access to every feature, including uploading files and photos, managing tasks and real-time updates.

Save the file as DXF, zip it and upload it. Inspector converts it into working layers on an interactive map.

Yes. The system is built for several projects in parallel, with permissions split by team, contractor or project phase.

Inspector produces bills of quantities and progress reports in Excel or PDF at the click of a button. The reports carry current field data: exact quantities, task status and full documentation.

No. Inspector is cloud SaaS. You register and log in. No local install and no dedicated servers.

Every new customer gets full training on the whole system, from registration and file upload through to task management and producing bills of quantities. Our team also supports the first rollout on real projects, and is available in Hebrew and English.