Design with information coming back from the field

Design offices work in a moving environment: revisions, quantity takeoffs, supervision reports, and an expectation of exact numbers throughout.

Inspector handles the mechanical part. Quantities come out of the drawing automatically, changes are tracked, and a supervision report is one click rather than an evening’s work.

What designers keep running into

Preparing a bill of quantities, then updating it. Every design change means updating quantities by hand across several file versions, which is where errors and delays come from.

Keeping track of why the design changed. Without one place holding the instructions and the reasons, version control and design consistency both suffer.

Design supervision on site. Getting to the current drawing in the field, or issuing a supervision report from there, is awkward, so instructions go undocumented and get carried out badly.

Engineers reviewing a drawing together
Design reviewed on screen

What Inspector does about it

Quantities out of the drawing. When the design is finished the bill of quantities is produced automatically, with no manual measuring into spreadsheets. When the design changes, the quantities update, and the system shows the difference between versions.

Version tracking. Design changes are presented plainly, with reports that set out what moved.

Collector for design supervision. The report can be issued the moment the site visit ends.

From the field

A lighting designer produced an execution estimate five minutes after finishing the design. Every later revision on that project needed no update to the bill of quantities, because it is derived rather than maintained.

Survey and design on the same project

What makes it different

CAD tied to the bill of quantities in one platform.
One drafting standard across the office, so the practice can spend its time designing instead of counting.
Design changes made visible, including where each one came from.

Water, sewer and neighbourhood development

Frequently asked questions

Do we have to change how we draw?

Not the way you draw, but the layers have to be organised consistently. We set that standard up with you once, as a legend, and from then on it carries across drawings and projects.

DXF, exported from AutoCAD or any package that writes it. No BIM model is required.

Yes, and that is one of the main reasons to use a shared legend. Work from several offices becomes comparable instead of each office counting its own way.

On this page
Stas Drapkin, Inspector

See it on a drawing of yours

office@inspectorprojects.com. Send a set and we will show you the quantities that come out of it.